Skip to content

Electrical Parameters from Meters

Table 11 — Electrical values read from the meters

No. Name Description Units
1 DATE Date, Month, Year
2 TIME Hour, Minute, Second
3 ADR Instrument Number
4 V-A Voltage Phase A (L1, L12) V
5 V-B Voltage Phase B (L2, L23) V
6 V-C Voltage Phase C (L3, L31) V
7 I-A Current Phase A (L1) A
8 I-B Current Phase B (L2) A
9 I-C Current Phase C (L3) A
10 P-A Active Power Phase A (L1) KW
11 P-B Active Power Phase B (L2) KW
12 P-C Active Power Phase C (L3) KW
13 PF-A Power Factor Phase A (L1)
14 PF-B Power Factor Phase B (L2)
15 PF-C Power Factor Phase C (L3)
16 TP Total Active Power KW
17 PF Power Factor — Average
18 CONS. Consumption KWH
19 I-L Ground/Earth Leakage A
20 FREQ. Frequency Hz
21 RP-A Reactive Power Phase A (L1) KVAR
22 RP-B Reactive Power Phase B (L2) KVAR
23 RP-C Reactive Power Phase C (L3) KVAR
24 AP-A Apparent Power Phase A (L1) KVA
25 AP-B Apparent Power Phase B (L2) KVA
26 AP-C Apparent Power Phase C (L3) KVA
27 RE Reactive Energy KVARH
28 TRP Total Reactive Power KVAR
29 TAP Total Apparent Power KVA
30 DEM. Maximum Demand KW
31 ACC.DEM Accumulated Maximum Demand KW
32 AMD-A Ampere Maximum Demand Phase A (L1) A
33 AMD-B Ampere Maximum Demand Phase B (L2) A
34 AMD-C Ampere Maximum Demand Phase C (L3) A
35 BRK Contact Status 290/B model only
36 CONS- Returned Consumption KWH
37 AP MAX.DEM Apparent Power Maximum Demand KVA
38 HV-A THD Voltage Phase A (L1, L12) %
39 HV-B THD Voltage Phase B (L2, L23) %
40 HV-C THD Voltage Phase C (L3, L31) %
41 HI-A THD Current Phase A (L1, L12) %
42 HI-B THD Current Phase B (L2, L23) %
43 HI-C THD Current Phase C (L3, L31) %
44 TOD Max. Demand TOD Maximum Demand KW
45 Period Demand Last Period Demand KW

Note

Some meter models do not measure every value in the table above. Values that are not measured are shown as 0.